Speculative Duplication and Cost Modeling in MLIR

Oct 6, 2025 Updated on Oct 7, 2025

1. Overview

Speculative duplication duplicates part of a computation—intentionally—to unlock a more profitable transformation (e.g., fusion or vectorization) on a hot path, guided by a cost model. In MLIR (Multi-Level Intermediate Representation), a canonical example is enabling FMA (Fused Multiply-Add) contraction when a producer operation has multiple consumers.


2. Running Example (Floating-Point)

Baseline IR (Intermediate Representation)

%y   = arith.mulf %x, %c1
%tmp = arith.subf %y, %c3
%z   = arith.addf %y, %c2

We would like to contract %y = x*c1 and the addf into a single arith.fma %x, %c1, %c2 for %z.
However, %y has multiple uses (%tmp and %z), so replacing %y would change %tmp’s semantics—illegal under SSA (Static Single Assignment).

Speculative Duplication Plan

%y   = arith.mulf %x, %c1        // kept for %tmp
%z   = arith.fma  %x, %c1, %c2   // duplicate multiply inside fma
%tmp = arith.subf %y, %c3
  • Correctness is preserved (each consumer gets the right value).
  • %z’s path benefits from FMA’s shorter dependency chain.

3. Legality Preconditions (Floating-Point)

  • Contraction allowed: arith.fastmath must include contract; otherwise mulf+addf → fma is not IEEE (Institute of Electrical and Electronics Engineers)-legal (two roundings vs one).
  • No side effects between producer and consumer.
  • Target must support real FMA; otherwise the rewrite regresses to mul+add.

Examples:

%z = arith.addf %y, %c2 {fastmath = [contract]}

func.func @f() attributes { arith.fastmath = [contract, reassoc] } { ... }

4. Why the Naive “Total Work” View Fails

A naive comparison sums operation costs:

$$ C_{add} > C_{fma} + P_{dup}, $$

which seems impossible because usually $C_{fma} \ge C_{add}$.
That view assumes all work is serialized—counting every instruction as if they block each other.

What Actually Matters

Only the critical-path latency to produce %z affects performance.
After duplication, the extra multiply for %tmp is independent of %z’s computation—it runs on another path or execution unit. Its cost should not be counted serially.


5. Path-Aware Model

Let $L_{op}$ denote latency (or an effective throughput proxy) for an operation on the %z path.

Baseline (no duplication): critical path to %z is mulf → addf, $$ L_{baseline} = L_{mul} + L_{add}. $$

With speculative duplication: critical path to %z is fma plus any path penalty, $$ L_{dup} = L_{fma} + P_{dup, path}. $$

Profitability condition (latency-bound): $$ \boxed{L_{mul} + L_{add} > L_{fma} + P_{dup, path}} $$

  • $P_{dup, path}$ = penalty that actually affects %z’s schedule (e.g., spill caused by higher pressure).
  • The multiply for %tmp exists in both cases and is off %z’s path; it should not be added to %z’s serial latency.

6. Visual Intuition for Path Latency

(a) Baseline — sequential dependency chain

        c1       c2
         │        │
x ───▶ mulf ───▶ addf ───▶ z
  • %z depends on both mulf and addf sequentially.
  • Latency to produce %z: L_mul + L_add (fully serial).

(b) After speculative duplication — independent paths

            ┌──────────▶ subi ───▶ tmp
x ──▶ mulf ─┘
 └──────────▶ fma  ───▶ z
  • %z now depends only on fma.
  • %tmp depends on the old mulf (runs in parallel).
  • Latency to produce %z: L_fma + P_dup,path, which is much shorter.

(c) Timing timeline

Baseline:
Time →  [ mulf ][ addf ] → z ready at cycle 8

With duplication:
Time →  [ mulf ][ subi ]         → tmp ready at 8
         [ fma ]                 → z ready at 4
  • More total instructions executed overall.
  • But %z finishes earlier, shortening the critical path.

(d) Concept summary

ViewMeasures%z ready timeMisleading?
Total workCounts all instructionsSame or higherYes — ignores parallelism
Path latencyLongest dependency chain to %zLowerCorrect

7. Typical Numbers (FP32)

  • x86 AVX-512: $L_{mul} \approx 3\text{–}4$, $L_{add} \approx 3\text{–}4$, $L_{fma} \approx 4$.
    Inequality holds if $P_{dup, path} < 2$ cycles.

  • NVIDIA GPU (FP32 core): $L_{mul} \approx 4\text{–}6$, $L_{add} \approx 4\text{–}6$, $L_{fma} \approx 4\text{–}6$.
    Often equal; still beneficial when shortening dependency chains aids scheduling.

  • ARM/Apple: $L_{fma} \approx L_{mul}$ and both are small; inequality often holds for modest $P_{dup, path}$.


8. Implementation Sketch

Matching

  1. Match mulf feeding addf producing %z.
  2. %y has multiple uses.
  3. fastmath includes contract.
  4. Target supports FMA (Fused Multiply-Add).

Rewriting

struct SpeculativeFMA : OpRewritePattern<arith::AddFOp> {
  LogicalResult matchAndRewrite(arith::AddFOp add,
                                PatternRewriter &rewriter) const override {
    auto mul = add.getLhs().getDefiningOp<arith::MulFOp>();
    if (!mul) return failure();
    if (!allowsContract(add)) return failure();
    if (mul.getResult().hasOneUse()) return failure(); // handled elsewhere
    if (!targetHasFMA(add.getType())) return failure();

    double Lmul = 4.0, Ladd = 4.0, Lfma = 4.0, Pdup = 1.0;
    if (Lmul + Ladd <= Lfma + Pdup) return failure();

    auto fma = rewriter.create<arith::FMAOp>(
        add.getLoc(), mul.getLhs(), mul.getRhs(), add.getRhs());
    rewriter.replaceOp(add, fma.getResult());
    return success();
  }
};

9. When It’s Worth It

  • Latency-bound regions: critical-path shortening dominates extra work.
  • Hardware FMA available: FMA throughput ≈ MUL throughput.
  • Moderate register pressure: duplication penalty small.
  • Fast-math with contraction: legally allowed transformation.

When It Isn’t

  • Throughput-bound code with wide ILP (Instruction Level Parallelism).
  • High register pressure or spilling (large $P_{dup, path}$).
  • Targets that lower FMA (Fused Multiply-Add) back into mul+add.
  • Strict IEEE (Institute of Electrical and Electronics Engineers)-754 without contract.

10. Summary

  • Goal: Improve latency on a hot path by fusing multiply and add via duplication.
  • Mechanism: Duplicate the multiply so one consumer can form an fma.
  • Decision rule: apply if $$ L_{mul} + L_{add} > L_{fma} + P_{dup, path}. $$
  • Key idea: judge by critical-path latency, not total instruction count.
  • Legality: requires fastmath=contract and hardware FMA.

11. Takeaway

Speculative duplication in MLIR (Multi-Level Intermediate Representation) is not about doing less work—it is about restructuring dependency graphs to shorten critical latency paths. The compiler duplicates an operation only when a path-aware cost model predicts that the shorter dependency chain outweighs any overhead from added instructions, register pressure, or scheduling noise.